Boeing 737 MAX 7 nears FAA certification by end of July 2026, a long-awaited win for Boeing and Southwest Airlines.
Boeing
Boeing’s next-generation combat aircraft ambitions, where the company is advancing construction of a new classified factory beside the headquarters of Boeing Defense, Space & Security (BDS).
Nick Batkoski, a former professional baseball player and third-generation Boeing teammate, now leads 777 and 777X fuselage assembly in Everett. He shares how the teamwork and resilience he built in elite sport shape the way he supports widebody production and mentors the next generation of Boeing workers.
Qantas (QF) continues to operate one of the world’s most demanding commercial flights between Perth Airport (PER) and London Heathrow Airport (LHR), pushing the Boeing 787-9 Dreamliner close to its practical operating limits on every journey.
Boeing has quietly updated the published range figures for its upcoming Boeing 777X family, significantly increasing the advertised capabilities of both the Boeing 777-8 and Boeing 777-9.
Boeing’s electronically dimmable window system on the Boeing 787 Dreamliner has become one of the aircraft manufacturer’s most frequently replaced cabin components, according to aviation maintenance professionals.
Boeing has officially begun operating a new Boeing 737 MAX final assembly line at its Everett, Washington facility, marking a significant milestone in the manufacturer’s long-term production strategy.
Boeing has reached another major milestone in the certification program for the 737-10 by successfully completing extreme crosswind autoland testing.
Thai Airways International (TG) has taken delivery of a new Boeing 787-9 aircraft as the carrier accelerates its fleet modernization strategy and expands long-haul capacity to meet growing international travel demand.
Boeing’s first production 777-9 for Lufthansa plans an 11-hour North Pole test flight reaching 85°N from Paine Field.