{"id":57647,"date":"2024-02-29T00:23:10","date_gmt":"2024-02-28T18:53:10","guid":{"rendered":"https:\/\/aviationa2z.com\/?p=57647"},"modified":"2024-03-22T21:21:58","modified_gmt":"2024-03-22T15:51:58","slug":"faa-gives-90-days-ultimatum-to-boeing-to-present-safety-plan","status":"publish","type":"post","link":"https:\/\/aviationa2z.com\/index.php\/2024\/02\/29\/faa-gives-90-days-ultimatum-to-boeing-to-present-safety-plan\/","title":{"rendered":"FAA Gives 90 Days Ultimatum to Boeing to Present Safety Plan After 737 MAX Incident"},"content":{"rendered":"\n<p><strong>WASHINGTON-<\/strong> During an extensive safety discussion held at <a href=\"https:\/\/aviationa2z.com\/?s=FAA\" target=\"_blank\" rel=\"noreferrer noopener\">FAA <\/a>Headquarters on Tuesday, FAA Administrator Mike Whitaker conveyed to senior <a href=\"https:\/\/aviationa2z.com\/?s=Boeing\" target=\"_blank\" rel=\"noreferrer noopener\">Boeing <\/a>officials that the aircraft manufacturer must formulate a comprehensive action plan to address its pervasive quality-control issues, aligning with FAA&#8217;s unwavering safety standards.<\/p>\n\n\n\n<p>Administrator Whitaker emphasized to Boeing the expectation of presenting the FAA with a thorough action plan within 90 days.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2024\/01\/image-37.png\" alt=\"FAA Gives 90 Days Ultimatum to Boeing to Present Safety Plan After 737 MAX Incident\" class=\"wp-image-54534\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2024\/01\/image-37.png 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2024\/01\/image-37-300x200.png 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2024\/01\/image-37-768x512.png 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2024\/01\/image-37-750x500.png 750w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo:  Tim | Flickr<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-faa-90-days-ultimatum-to-boeing\">FAA 90 Days Ultimatum to Boeing<\/h2>\n\n\n\n<p>\u201cBoeing must commit to real and profound improvements,\u201d stated Administrator Whitaker after meeting with Boeing Chief Executive Officer President Dave Calhoun and his senior safety team. \u201cMaking foundational change will require a sustained effort from Boeing\u2019s leadership, and we are going to hold them accountable every step of the way, with mutually understood milestones and expectations.\u201d<\/p>\n\n\n\n<p>This plan should incorporate the forthcoming outcomes of the FAA production-line audit and the latest findings from the expert review panel report mandated by the Aircraft Certification, Safety, and Accountability Act of 2020.<\/p>\n\n\n\n<p>The action plan should encompass measures outlining Boeing&#8217;s efforts to advance its Safety Management System (SMS) program, a commitment made in 2019.<\/p>\n\n\n\n<p>Additionally, Boeing must integrate its SMS program with a Quality Management System, ensuring consistent rigor and oversight are extended to the company\u2019s suppliers. This integration aims to instigate a measurable, systemic transformation in manufacturing quality control.<\/p>\n\n\n\n<p>\u201cBoeing must take a fresh look at every aspect of their quality-control process and ensure that safety is the company\u2019s guiding principle,\u201d emphasized Administrator Whitaker.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/08\/34200606531_dabce79cf5_b-edited.jpg\" alt=\"FAA Gives 90 Days Ultimatum to Boeing to Present Safety Plan After 737 MAX Incident\" class=\"wp-image-25677\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/08\/34200606531_dabce79cf5_b-edited.jpg 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/08\/34200606531_dabce79cf5_b-edited-600x338.jpg 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/08\/34200606531_dabce79cf5_b-edited-300x169.jpg 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/08\/34200606531_dabce79cf5_b-edited-768x432.jpg 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/08\/34200606531_dabce79cf5_b-edited-750x422.jpg 750w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Wilco737 | Flickr<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-faa-inspection-and-audit\">FAA Inspection and Audit<\/h2>\n\n\n\n<p>On February 12, Administrator Whitaker visited Boeing&#8217;s factory floor in Renton, <a href=\"https:\/\/aviationa2z.com\/?s=Washington\" target=\"_blank\" rel=\"noreferrer noopener\">Washington<\/a>, to inspect the 737 production line and engage with Boeing engineers, mechanics, and other personnel to gain insights into quality control processes.<\/p>\n\n\n\n<p>Additionally, the Administrator visited the <a href=\"https:\/\/aviationa2z.com\/?s=Alaska+Airlines\" target=\"_blank\" rel=\"noreferrer noopener\">Alaska Airlines (AS)<\/a> headquarters to discuss the incident involving the left mid-cabin door plug on Alaska Airlines Flight 1282 that occurred on January 5.<\/p>\n\n\n\n<p>As part of its response to ongoing concerns, the FAA has halted the production expansion of the <a href=\"https:\/\/aviationa2z.com\/?s=737+MAX\" target=\"_blank\" rel=\"noreferrer noopener\">Boeing 737 MAX<\/a>. The FAA is actively exploring the potential involvement of a third party for overseeing Boeing.<\/p>\n\n\n\n<p>Furthermore, the agency is in the final stages of completing an enhanced oversight audit of Boeing\u2019s production and manufacturing quality systems. An investigation into Boeing\u2019s alleged noncompliance is also underway.<\/p>\n\n\n\n<p>Stay tuned with us. Further, follow us on social media for the latest updates.<\/p>\n\n\n\n<p>Join us on&nbsp;<a href=\"https:\/\/t.me\/s\/aviationa2z\" rel=\"nofollow\">Telegram Group&nbsp;<\/a>for the Latest Aviation Updates. Subsequently, follow us on&nbsp;<a href=\"https:\/\/news.google.com\/publications\/CAAqBwgKMPLdrgsw_-jGAw?hl=en-IN&amp;gl=IN&amp;ceid=IN%3Aen\">Google News<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-aviation-a-2-z wp-block-embed-aviation-a-2-z\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"gsPYw0Gqfe\"><a href=\"https:\/\/aviationa2z.com\/index.php\/2024\/03\/22\/boeing-considers-exiting-airbus-contracts-in-spirit-aerosystems-acquisition\/\">Boeing Considers Exiting Airbus Contracts in New Spirit AeroSystems Acquisition<\/a><\/blockquote><iframe class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; clip: rect(1px, 1px, 1px, 1px);\" title=\"&#8220;Boeing Considers Exiting Airbus Contracts in New Spirit AeroSystems Acquisition&#8221; &#8212; Aviation A2Z\" src=\"https:\/\/aviationa2z.com\/index.php\/2024\/03\/22\/boeing-considers-exiting-airbus-contracts-in-spirit-aerosystems-acquisition\/embed\/#?secret=3MA5GTNCY0#?secret=gsPYw0Gqfe\" data-secret=\"gsPYw0Gqfe\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>FAA conveyed to Boeing that aircraft manufacturer must formulate a comprehensive action plan to address its pervasive quality-control issues<\/p>\n","protected":false},"author":1,"featured_media":56261,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[8468,6761,7308,7307],"tags":[8003,190,16616,2030,249,16688,6261,6365,316,18531,10232,7219],"class_list":{"0":"post-57647","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-boeing","8":"category-news","9":"category-us-airlines-news","10":"category-usa-aviation-news","11":"tag-aerospace-news","12":"tag-alaska-airlines","13":"tag-alaska-airlines-737-max-incident","14":"tag-aviation-a2z-news","15":"tag-boeing-737-max","16":"tag-boeing-737-max-incidents","17":"tag-boeing-audit","18":"tag-boeing-news","19":"tag-faa","20":"tag-faa-90-days-ultimatum-to-boeing","21":"tag-faa-news","22":"tag-usa-aviation-news"},"_links":{"self":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/57647","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/comments?post=57647"}],"version-history":[{"count":3,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/57647\/revisions"}],"predecessor-version":[{"id":59192,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/57647\/revisions\/59192"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media\/56261"}],"wp:attachment":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media?parent=57647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/categories?post=57647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/tags?post=57647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}