{"id":48847,"date":"2023-10-17T10:21:41","date_gmt":"2023-10-17T04:51:41","guid":{"rendered":"https:\/\/aviationa2z.com\/?p=48847"},"modified":"2024-04-16T14:27:49","modified_gmt":"2024-04-16T08:57:49","slug":"mumbai-airport-remain-shut-for-hours-today","status":"publish","type":"post","link":"https:\/\/aviationa2z.com\/index.php\/2023\/10\/17\/mumbai-airport-remain-shut-for-hours-today\/","title":{"rendered":"Mumbai Airport to Remain Shut for 6 Hours Today"},"content":{"rendered":"\n<p><strong>MUMBAI-<\/strong> Today, on October 17, both runways at <a href=\"https:\/\/aviationa2z.com\/?s=Mumbai+Airport\" target=\"_blank\" rel=\"noreferrer noopener\">Mumbai Airport (BOM)<\/a>, officially known as Chhatrapati Shivaji Maharaj International Airport (CSMIA), will undergo maintenance work, resulting in a six-hour closure with no flight operations.<\/p>\n\n\n\n<p>The runway maintenance is scheduled to take place from 11 a.m. to 5 p.m. on this Tuesday, as previously announced by the airport operator.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"591\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1049927_1684454466-1024x591.jpg\" alt=\"MUMBAI- Today, on October 17, both runways at Mumbai Airport (BOM), officially known as Chhatrapati Shivaji Maharaj International Airport (CSMIA), will undergo maintenance work, resulting in a six-hour closure with no flight operations.\" class=\"wp-image-35379\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1049927_1684454466-1024x591.jpg 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1049927_1684454466-600x346.jpg 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1049927_1684454466-300x173.jpg 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1049927_1684454466-768x443.jpg 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1049927_1684454466-750x433.jpg 750w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1049927_1684454466-1140x658.jpg 1140w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1049927_1684454466.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Aadi Gupte<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mumbai-airport-shut-today\">Mumbai Airport Shut Today<\/h2>\n\n\n\n<p>In accordance with the statement, &#8220;As part of CSMIA&#8217;s comprehensive post-monsoon runway maintenance plan, both runways &#8211; RWY 09\/27 and RWY 14\/32 &#8211; will temporarily be non-operational on October 17 from 1100 hours to 1700 hours.&#8221;<\/p>\n\n\n\n<p>The statement also emphasizes the collaboration of CSMIA with all key stakeholders to effectively manage flight schedules and ensure the smooth execution of the maintenance. The airport authorities are counting on the cooperation and understanding of passengers.<\/p>\n\n\n\n<p>It&#8217;s worth noting that the airport typically handles nearly 900 flights every day.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"678\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/Mumbai-Airport-1024x678.png\" alt=\"MUMBAI- Today, on October 17, both runways at Mumbai Airport (BOM), officially known as Chhatrapati Shivaji Maharaj International Airport (CSMIA), will undergo maintenance work, resulting in a six-hour closure with no flight operations.\" class=\"wp-image-35272\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/Mumbai-Airport-1024x678.png 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/Mumbai-Airport-600x397.png 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/Mumbai-Airport-300x199.png 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/Mumbai-Airport-768x508.png 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/Mumbai-Airport-750x496.png 750w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/Mumbai-Airport-1140x754.png 1140w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/Mumbai-Airport.png 1230w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Via CSMIA Official Twitter handle, Chhatrapati Shivaji Maharaj International Airport.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-post-monsoon-maintenance\">Post-Monsoon Maintenance<\/h2>\n\n\n\n<p>The upcoming temporary closure is a scheduled part of CSMIA&#8217;s annual post-monsoon preventive maintenance plan. This planned closure aims to facilitate repair and maintenance operations for maintaining the airport&#8217;s infrastructure at the highest standards.<\/p>\n\n\n\n<p>Authorities have proactively issued a Notice to Airmen (NOTAM) to airlines and other relevant stakeholders well in advance, approximately six months ago.<\/p>\n\n\n\n<p>Additionally, Mumbai Airport has introduced a specialized Disabled Aircraft Recovery Kit (DARK) designed to lift and tow aircraft within the operational area in case of an unforeseen mishap. <\/p>\n\n\n\n<p>Prior to this, Tata Group-owned Air India was the sole aviation entity in the country equipped with a DARK. This advanced equipment has the capability to swiftly recover aircraft, including the hefty <a href=\"https:\/\/aviationa2z.com\/?s=Boeing+777\" target=\"_blank\" rel=\"noreferrer noopener\">Boeing 777-300<\/a>, which boasts a weight of 390 metric tonnes.<\/p>\n\n\n\n<p>Stay tuned with us. Further, follow us on social media for the latest updates.<\/p>\n\n\n\n<p>Join us on&nbsp;<a href=\"https:\/\/t.me\/s\/aviationa2z\" rel=\"nofollow\">Telegram Group&nbsp;<\/a>for the Latest Aviation Updates. Subsequently, follow us on&nbsp;<a href=\"https:\/\/news.google.com\/publications\/CAAqBwgKMPLdrgsw_-jGAw?hl=en-IN&amp;gl=IN&amp;ceid=IN%3Aen\">Google News<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-aviation-a-2-z wp-block-embed-aviation-a-2-z\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"hsxKLCioja\"><a href=\"https:\/\/aviationa2z.com\/index.php\/2024\/04\/16\/mumbai-airports-runways-closed-for-maintenance\/\">Mumbai Airport&#8217;s Both Runways will be Closed for Maintenance<\/a><\/blockquote><iframe class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; clip: rect(1px, 1px, 1px, 1px);\" title=\"&#8220;Mumbai Airport&#8217;s Both Runways will be Closed for Maintenance&#8221; &#8212; Aviation A2Z\" src=\"https:\/\/aviationa2z.com\/index.php\/2024\/04\/16\/mumbai-airports-runways-closed-for-maintenance\/embed\/#?secret=yBd5VfaQqt#?secret=hsxKLCioja\" data-secret=\"hsxKLCioja\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Today, on October 17, both runways at Mumbai Airport (BOM), officially known as Chhatrapati Shivaji Maharaj International Airport (CSMIA), will undergo maintenance work, resulting in a six-hour closure with no flight operations.<\/p>\n","protected":false},"author":1,"featured_media":35377,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[8149,7217,6761],"tags":[9329,2629,1013,1208,5752,2943],"class_list":{"0":"post-48847","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-airport","8":"category-indian-aviation-news","9":"category-news","10":"tag-adani-mumbai-airport","11":"tag-chhatrapati-shivaji-mumbai-international-airport","12":"tag-mumbai","13":"tag-mumbai-airport","14":"tag-mumbai-international-airport-limited","15":"tag-mumbais-chhatrapati-shivaji-maharaj-international-airport"},"_links":{"self":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/48847","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/comments?post=48847"}],"version-history":[{"count":6,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/48847\/revisions"}],"predecessor-version":[{"id":61847,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/48847\/revisions\/61847"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media\/35377"}],"wp:attachment":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media?parent=48847"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/categories?post=48847"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/tags?post=48847"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}