{"id":44502,"date":"2023-09-12T15:41:13","date_gmt":"2023-09-12T10:11:13","guid":{"rendered":"https:\/\/aviationa2z.com\/?p=44502"},"modified":"2023-09-16T14:28:45","modified_gmt":"2023-09-16T08:58:45","slug":"bengaluru-airport-new-terminal-2-starts-operations","status":"publish","type":"post","link":"https:\/\/aviationa2z.com\/index.php\/2023\/09\/12\/bengaluru-airport-new-terminal-2-starts-operations\/","title":{"rendered":"Bengaluru Airport New Terminal-2 Starts Its Operations with Saudia Flight"},"content":{"rendered":"\n<p><strong>BENGALURU-<\/strong> Today (September 12, 2023), <a href=\"https:\/\/aviationa2z.com\/?s=Bengaluru\" target=\"_blank\" rel=\"noreferrer noopener\">Bengaluru Kempegowda International Airport (BLR) <\/a>officially began its international flight operations at the newly constructed Terminal 2 (T2), which was built at a cost of Rs 13,000 crore. <\/p>\n\n\n\n<p>The inaugural international flight, <a href=\"https:\/\/aviationa2z.com\/?s=Saudia\" target=\"_blank\" rel=\"noreferrer noopener\">Saudia (SV) <\/a>flight SV866, arriving from Jeddah, touched down at the terminal at 10:15 a.m. Bengaluru International Airport Limited representatives were present to observe the aircraft&#8217;s landing.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1-Terminal-2-of-Kempegowda-International-Airport-pictures-1024x576.webp\" alt=\"Bengaluru Kempegowda International Airport (BLR) officially began its international flight operations at the newly constructed Terminal 2 (T2), which was built at a cost of Rs 13,000 crore. \" class=\"wp-image-34863\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1-Terminal-2-of-Kempegowda-International-Airport-pictures-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1-Terminal-2-of-Kempegowda-International-Airport-pictures-600x338.webp 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1-Terminal-2-of-Kempegowda-International-Airport-pictures-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1-Terminal-2-of-Kempegowda-International-Airport-pictures-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1-Terminal-2-of-Kempegowda-International-Airport-pictures-750x422.webp 750w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1-Terminal-2-of-Kempegowda-International-Airport-pictures-1140x641.webp 1140w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/06\/1-Terminal-2-of-Kempegowda-International-Airport-pictures.webp 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: ANI<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-bengaluru-terminal-2-starts-operations\">Bengaluru Terminal-2 Starts Operations<\/h2>\n\n\n\n<p>Following the inaugural arrival, <a href=\"https:\/\/aviationa2z.com\/?s=IndiGo\" target=\"_blank\" rel=\"noreferrer noopener\">IndiGo (6E)<\/a> made history by becoming the first domestic airline to operate an international flight from the terminal. <\/p>\n\n\n\n<p>Their flight, IndiGo 6E 1167, bound for Colombo, took off from T2 at 12:10 p.m. To commemorate this significant occasion, a lamp-lighting ceremony was hosted by BIAL and attended by representatives from Saudia and IndiGo. <\/p>\n\n\n\n<p>T2, inaugurated by Prime Minister Narendra Modi on November 11 of the previous year, is set to play a crucial role in Bengaluru&#8217;s international air travel landscape, with the capacity to accommodate over 30 foreign departures.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/05\/IndiGo_VT-IFZ_at_Bangalore_Dec_2015-1024x768.jpg\" alt=\"Bengaluru Kempegowda International Airport (BLR) officially began its international flight operations at the newly constructed Terminal 2 (T2), which was built at a cost of Rs 13,000 crore. \" class=\"wp-image-32884\" width=\"1023\" height=\"767\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/05\/IndiGo_VT-IFZ_at_Bangalore_Dec_2015-1024x768.jpg 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/05\/IndiGo_VT-IFZ_at_Bangalore_Dec_2015-600x450.jpg 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/05\/IndiGo_VT-IFZ_at_Bangalore_Dec_2015-300x225.jpg 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/05\/IndiGo_VT-IFZ_at_Bangalore_Dec_2015-768x576.jpg 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/05\/IndiGo_VT-IFZ_at_Bangalore_Dec_2015-750x563.jpg 750w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/05\/IndiGo_VT-IFZ_at_Bangalore_Dec_2015-1140x855.jpg 1140w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/05\/IndiGo_VT-IFZ_at_Bangalore_Dec_2015.jpg 1200w\" sizes=\"(max-width: 1023px) 100vw, 1023px\" \/><figcaption class=\"wp-element-caption\">Photo: By Venkat Mangudi &#8211; flickr.com\/photos\/venkatmangudi\/23097720643\/, CC0, <br>https:\/\/commons.wikimedia.org\/w\/index.php?curid=50390832<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-serving-domestic-and-international-airlines\">Serving Domestic and International Airlines<\/h2>\n\n\n\n<p>Terminal 2 (T2) will serve as the gateway for a total of 27 airlines, comprising 25 international carriers and two Indian airlines. This terminal is designed to handle an additional 2.5 crore air passengers. <\/p>\n\n\n\n<p>Notably, T2 is among the world&#8217;s largest terminals and boasts the unique feature of a hanging garden, marking the first occurrence of such an innovation in Asia.<\/p>\n\n\n\n<p>On the other hand, Terminal 1 (T1) will be exclusively dedicated to domestic flights, serving airlines like Air Akasa, Alliance Air, IndiGo, and SpiceJet. <\/p>\n\n\n\n<p>Domestic operations for AirAsia, Air India, Star Air, and Vistara will also take place at T2, ensuring a seamless experience for passengers traveling to and from Bengaluru.<\/p>\n\n\n\n<p>Bengaluru Airport, one of the world&#8217;s fastest-growing airports and the busiest in South India, began its operations on May 24, 2008. By 2019, it had successfully managed to serve more than 33 million passengers.<\/p>\n\n\n\n<p>Stay tuned with us. Further, follow us on social media for the latest updates.<\/p>\n\n\n\n<p>Join us on&nbsp;<a href=\"https:\/\/t.me\/s\/aviationa2z\" rel=\"nofollow\">Telegram Group&nbsp;<\/a>for the Latest Aviation Updates. Subsequently, follow us on&nbsp;<a href=\"https:\/\/news.google.com\/publications\/CAAqBwgKMPLdrgsw_-jGAw?hl=en-IN&amp;gl=IN&amp;ceid=IN%3Aen\">Google News<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-aviation-a-2-z wp-block-embed-aviation-a-2-z\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"9e995UF0gp\"><a href=\"https:\/\/aviationa2z.com\/index.php\/2023\/09\/16\/bengaluru-airport-third-terminal-to-open-by-2030s\/\">Bengaluru Airport Third and New Terminal to Open by 2030s<\/a><\/blockquote><iframe class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; clip: rect(1px, 1px, 1px, 1px);\" title=\"&#8220;Bengaluru Airport Third and New Terminal to Open by 2030s&#8221; &#8212; Aviation A2Z\" src=\"https:\/\/aviationa2z.com\/index.php\/2023\/09\/16\/bengaluru-airport-third-terminal-to-open-by-2030s\/embed\/#?secret=UsyGQDv5x0#?secret=9e995UF0gp\" data-secret=\"9e995UF0gp\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>BENGALURU- Today (September 12, 2023), Bengaluru Kempegowda International Airport (BLR) officially began its international flight operations at the newly constructed Terminal 2 (T2), which was built at a cost of Rs 13,000 crore. <\/p>\n","protected":false},"author":1,"featured_media":35085,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[8149,7217,6761],"tags":[960,105,1720,8799,9270,8803],"class_list":{"0":"post-44502","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-airport","8":"category-indian-aviation-news","9":"category-news","10":"tag-bengaluru","11":"tag-bengaluru-airport","12":"tag-bengaluru-international-airport","13":"tag-bengaluru-t2","14":"tag-bengaluru-t2-international-flights","15":"tag-t2-bengaluru"},"_links":{"self":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/44502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/comments?post=44502"}],"version-history":[{"count":3,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/44502\/revisions"}],"predecessor-version":[{"id":45657,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/44502\/revisions\/45657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media\/35085"}],"wp:attachment":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media?parent=44502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/categories?post=44502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/tags?post=44502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}