{"id":30103,"date":"2023-04-05T12:25:34","date_gmt":"2023-04-05T06:55:34","guid":{"rendered":"https:\/\/aviationa2z.com\/?p=30103"},"modified":"2023-04-05T12:25:38","modified_gmt":"2023-04-05T06:55:38","slug":"mumbai-airport-will-temporarily-close-both-runways-for-maintenance-on-2-may","status":"publish","type":"post","link":"https:\/\/aviationa2z.com\/index.php\/2023\/04\/05\/mumbai-airport-will-temporarily-close-both-runways-for-maintenance-on-2-may\/","title":{"rendered":"Mumbai Airport Will Temporarily Close Both Runways For Maintenance, On 2 May"},"content":{"rendered":"\n<p class=\"has-drop-cap\">The <strong>Chhatrapati Shivaji Maharaj International Airport<\/strong> (CSMIA) in Mumbai has announced that both runways <strong>RWY 09\/27 and RWY 14\/32 <\/strong>will be closed for six hours on May 2 for maintenance work as part of its monsoon contingency plan.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>The scheduled temporary runway closure is an annual exercise, and a contingency plan will help <strong>maintain operational continuity and ensure passenger safety<\/strong>, the private airport operator said in a statement, according to PTI.<\/p><\/blockquote>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"510\" height=\"340\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Mumbai-airport-new.jpg\" alt=\"CSMIA in Mumbai has announced that both runways RWY 09\/27 and RWY 14\/32 will be closed for six hours on May 2 for maintenance work \" class=\"wp-image-30104\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Mumbai-airport-new.jpg 510w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Mumbai-airport-new-300x200.jpg 300w\" sizes=\"(max-width: 510px) 100vw, 510px\" \/><\/figure>\n\n\n\n<p>The temporary closure will be from 11 a.m. to 5 p.m., according to CSMIA, and a <strong>NOTAM<\/strong> (Notice to Airmen) has been issued in this regard. <em>All operations will resume as usual on May 2 after 5 p.m., it added.<\/em><\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>The <strong>Mumbai Airport (CSMIA) handles approximately 900 flights per day. <\/strong>The repair work is done on a yearly basis, and regular maintenance, especially during the <em>monsoon season, ensures operational continuity and passenger safety<\/em>.<\/p><\/blockquote>\n\n\n\n<pre class=\"wp-block-verse\">\"The CSMIA is one of the busiest <strong>single runway airports<\/strong> in the world, with nearly 900 flight movements per day.\n\n The airport has nearly 1,033 acres of <em><strong>runways, taxiways, and apron space.<\/strong><\/em> \n\nThus, timely check and repair work on the runways and associated facilities is critical to maintaining their <strong>health and operational continuity<\/strong> during the monsoon months \"According to the official statement.<\/pre>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"533\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Chhatrapati-Shivaji-International-Airport.jpg\" alt=\"\" class=\"wp-image-30105\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Chhatrapati-Shivaji-International-Airport.jpg 800w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Chhatrapati-Shivaji-International-Airport-600x400.jpg 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Chhatrapati-Shivaji-International-Airport-300x200.jpg 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Chhatrapati-Shivaji-International-Airport-768x512.jpg 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2023\/04\/Chhatrapati-Shivaji-International-Airport-750x500.jpg 750w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p>Before the monsoon hits the city, the 1033-acre runways, taxiways, aprons, and so on are repaired. <\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;The yearly practise of runway maintenance work involves specialists in engineering and airside teams inspecting the <strong>runway surface for micro-texture and macro-texture wear and tear<\/strong> that may have occurred due to day-to-day operations and aiding in the <strong>strengthening of the airside strip,<\/strong>&#8221; according to a CSMIA statement.<\/p><\/blockquote>\n\n\n\n<p>Because this is a planned activity, CSMIA informed its <strong>stakeholders six months ahead of time<\/strong>. In fact, because airlines are aware of the scheduled activity, they have already planned flight schedules accordingly.<\/p>\n\n\n\n<p>Also read :- <a href=\"https:\/\/aviationa2z.com\/index.php\/2023\/04\/05\/worlds-lightest-paint-ever-created-a-boeing-747-can-be-completely-painted-with-just-1-kg-paint\/\">The World&#8217;s Lightest Paint Ever Created. A Boeing 747 Can Be Completely Painted With Just 1 Kg Paint<\/a><\/p>\n\n\n\n<p>Stay tuned\u2026 <\/p>\n\n\n\n<p>Join Our <a href=\"https:\/\/t.me\/aviationa2z\">Telegram Group<\/a> for Latest Aviation Updates <\/p>\n","protected":false},"excerpt":{"rendered":"<p>CSMIA in Mumbai has announced that both runways RWY 09\/27 and RWY 14\/32 will be closed for six hours on May 2 for maintenance work <\/p>\n","protected":false},"author":2,"featured_media":30105,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[7216,399,7217,6761],"tags":[2030,1205,1208,2943,7926,7927,7928],"class_list":{"0":"post-30103","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aviation-news","8":"category-featured","9":"category-indian-aviation-news","10":"category-news","11":"tag-aviation-a2z-news","12":"tag-csmia","13":"tag-mumbai-airport","14":"tag-mumbais-chhatrapati-shivaji-maharaj-international-airport","15":"tag-runway-maintenance","16":"tag-rwy-09-27","17":"tag-rwy-14-32"},"_links":{"self":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/30103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/comments?post=30103"}],"version-history":[{"count":1,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/30103\/revisions"}],"predecessor-version":[{"id":30106,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/30103\/revisions\/30106"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media\/30105"}],"wp:attachment":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media?parent=30103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/categories?post=30103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/tags?post=30103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}