{"id":28603,"date":"2022-12-19T17:23:17","date_gmt":"2022-12-19T11:53:17","guid":{"rendered":"https:\/\/aviationa2z.com\/?p=28603"},"modified":"2022-12-19T17:30:26","modified_gmt":"2022-12-19T12:00:26","slug":"exclusive-adani-group-plans-to-invest-rs-10700-crore-in-the-expansion-of-lucknow-international-airport","status":"publish","type":"post","link":"https:\/\/aviationa2z.com\/index.php\/2022\/12\/19\/exclusive-adani-group-plans-to-invest-rs-10700-crore-in-the-expansion-of-lucknow-international-airport\/","title":{"rendered":"Exclusive| Adani group plans to invest in the expansion of Lucknow International airport"},"content":{"rendered":"\n<p class=\"has-text-align-left\"><strong><em>The Adani group\u00a0would invest Rs 10,700 crore to develop Lucknow\u00a0International Airport Limited (LIAL), rising its annual passenger handling capacity from four million passengers per year (MPPA) to 39 MPPA.<\/em><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-adani-group\">Adani Group\u00a0<\/h2>\n\n\n\n<p>On December 15, the Union Environment Ministry approved the Lucknow airport\u2019s expansion plan. However, the expansion time frame was not specified in the plan submitted to the ministry of India. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/03\/gautam-adani-44-jpg_1200x900xt-1024x768.webp\" alt=\"\" class=\"wp-image-19391\" width=\"1033\" height=\"775\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/03\/gautam-adani-44-jpg_1200x900xt-1024x768.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/03\/gautam-adani-44-jpg_1200x900xt-600x450.webp 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/03\/gautam-adani-44-jpg_1200x900xt-300x225.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/03\/gautam-adani-44-jpg_1200x900xt-768x576.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/03\/gautam-adani-44-jpg_1200x900xt-750x563.webp 750w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/03\/gautam-adani-44-jpg_1200x900xt-1140x855.webp 1140w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/03\/gautam-adani-44-jpg_1200x900xt.webp 1200w\" sizes=\"(max-width: 1033px) 100vw, 1033px\" \/><figcaption><strong>Adani Group | Aviationa2z.com<\/strong><\/figcaption><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>According to previous reports, the Adani Group\u00a0plans to invest over Rs 10,000 crore at the Ahmedabad airport between the next year 2023 and 2027 to raise its passenger handling capacity and turn it into a regional hub.\u00a0The plan for <strong><a href=\"https:\/\/en.wikipedia.org\/wiki\/Chaudhary_Charan_Singh_Airport\" target=\"_blank\" rel=\"noreferrer noopener\">Lucknow\u00a0International Airport Limited (LIAL<\/a><\/strong>), an Adani group, stated: \u201cCCSIA (Chaudhary Charan Singh International Airport) in Lucknow\u00a0has a total land area of 509.41 hectares (1258.80 acres), making it one of the most land-constrained airports in  Lucknow\u00a0International Airport Limited (LIAL).\u201d LIAL now proposes expanding\u00a0Chaudhary Charan Singh International Airport to 457.1 hectares in size, it said.<\/p><\/blockquote>\n\n\n\n<p>\u201cChaudhary Charan Singh International Airport now there has 2 operational passenger terminals: an international terminal (Terminal 1) and a domestic terminal (Terminal 2). A new integrated terminal building (Terminal 3) is under construction, it was located in the west of Terminal 1,\u201d it stated.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-chaudhary-charan-singh-international-airport\">Chaudhary Charan Singh International Airport<\/h2>\n\n\n\n<p>Along with Terminal 3, a new terminal building (T4), as well as accompanying infrastructure, aid facilities, and utilities, will be constructed to accommodate 39 MPPA, according to our design<\/p>\n\n\n\n<p>According to the source in October presentation by the Adani group, <strong><a href=\"https:\/\/en.wikipedia.org\/wiki\/Chaudhary_Charan_Singh_Airport\" target=\"_blank\" rel=\"noreferrer noopener\">CCSIA <\/a><\/strong>is currently capable of handling 4 MPPA.\u00a0According to LIAL\u2019s plans, a cargo complex with a total area of 23.14 hectares will be built at <strong><a href=\"https:\/\/en.wikipedia.org\/wiki\/Chaudhary_Charan_Singh_Airport\" target=\"_blank\" rel=\"noreferrer noopener\">CCSIA <\/a><\/strong>to handle cargo weighing up to 0.25 metric tons tonnes per year.\u00a0The Adani Group took up <strong><a href=\"https:\/\/en.wikipedia.org\/wiki\/Chaudhary_Charan_Singh_Airport\" target=\"_blank\" rel=\"noreferrer noopener\">CCSIA <\/a><\/strong>from the Airports Authority of India in November 2020. (AAI).<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22-1024x768.jpg\" alt=\"\" class=\"wp-image-28604\" width=\"1035\" height=\"776\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22-1024x768.jpg 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22-600x450.jpg 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22-300x225.jpg 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22-768x576.jpg 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22-1536x1152.jpg 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22-750x563.jpg 750w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22-1140x855.jpg 1140w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2022\/12\/Lucknow_Airport_1_Pascall_Watson_4_3_22.jpg 2000w\" sizes=\"(max-width: 1035px) 100vw, 1035px\" \/><figcaption><strong>Chaudhary Charan Singh International Airport | Aviationa2z.com<\/strong><\/figcaption><\/figure>\n\n\n\n<p>According to our strategy, the expansion project will employ approximately 2,000 people directly and indirectly during its development phase, and around 25,000 people will be operated once it is operational. It further said that the \u201cproject cost\u201d is Rs 10,700 crore.<\/p>\n\n\n\n<p>The Adani Group did not answer a request for comment from the newspaper.\u00a0It will also make a multi-modal transportation hub with metro connectivity, multi-level vehicle parking, cityside check-in and self-bag drop facilities, and curbside services for passengers and passengers coming to the airport from neighboring areas. According to LIAL, it has suggested multi-level parking where around 4,000 vehicles can park.<\/p>\n\n\n\n<p><strong>Also, read       <\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong><a href=\"https:\/\/aviationa2z.com\/index.php\/2022\/04\/26\/dgca-asks-air-india-to-repair-aircraft-after-passenger-complains-of-shabby-interiors\/\" target=\"_blank\" rel=\"noreferrer noopener\">DGCA asks Air India to repair aircraft after passenger complains of shabby interiors<\/a>                 <\/strong><\/li><li><strong><a href=\"https:\/\/aviationa2z.com\/index.php\/2022\/10\/24\/ayushmann-khurrana-claims-pilot-purposefully-delayed-flight-to-watch-ind-pak-match-exclusive\/\" target=\"_blank\" rel=\"noreferrer noopener\">Ayushmann Khurrana Claims Pilot Purposefully Delayed Flight To Watch Ind-pak Match | Exclusive<\/a>         <\/strong><\/li><li><strong><a href=\"https:\/\/aviationa2z.com\/index.php\/2022\/12\/15\/home-secretary-ajay-kumar-bhalla-holds-a-high-level-meeting-amid-delhi-airport-rush-exclusive\/\" target=\"_blank\" rel=\"noreferrer noopener\">Home secretary Ajay Kumar Bhalla holds a high-level meeting amid\u00a0Delhi Airport rush | Exclusive<\/a><\/strong><\/li><\/ul>\n\n\n\n<p>\u201cPedestrian walkways are planned to connect multi-level car parking to terminal departure and coming areas, permitting passengers and greeters to park in multi-level car parking and walk down to the pickup and drop-off curbs,\u201d according to the report.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-uttar-pradesh-government\">Uttar Pradesh Government<\/h2>\n\n\n\n<p>It was estimated that 9.6 million liters per day (MLD) of water would be needed to process 39 MPPA. The <strong><a href=\"https:\/\/up.gov.in\/\" target=\"_blank\" rel=\"noreferrer noopener\">Uttar Pradesh government<\/a><\/strong> or borewells would supply 4.5 MLD, while the remaining 5.1 will be sourced from the sewage treatment facility for landscaping and flushing, according to the statement.<\/p>\n\n\n\n<p>The Adani Group has slowly expanded its footprint to the aviation sector over the past few years. The Airports Authority of India (AAI) leased airports in<strong> Lucknow, Jaipur, Mangaluru, Thiruvananthapuram, Ahmedabad, and Guwahati<\/strong> in February 2019 after a competitive bidding process.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021-1024x576.jpg\" alt=\"\" class=\"wp-image-15998\" width=\"1033\" height=\"581\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021-1024x576.jpg 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021-600x338.jpg 600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021-300x169.jpg 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021-768x432.jpg 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021-1536x864.jpg 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021-750x422.jpg 750w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021-1140x641.jpg 1140w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2021\/12\/Indian-aviation-industry-was-able-to-breathe-a-little-easier-in-2021.jpg 1920w\" sizes=\"(max-width: 1033px) 100vw, 1033px\" \/><figcaption><strong>Aviationa2z.com<\/strong><\/figcaption><\/figure>\n\n\n\n<p>The Adani Group outbid everyone else and acquired the rights to handle all 6 of them for the next fifty years.\u00a0In October of this year, it paid a large sum of money for Air Works, India\u2019s second-oldest aircraft maintenance, repair, and overhaul unit.<\/p>\n\n\n\n<p><strong>It paid Rs 400 crore to Air Works, India\u2019s second-oldest aircraft maintenance, repair, and overhaul firm, in October of the current year 2022.<\/strong><\/p>\n\n\n\n<p><strong>Thank you<\/strong><\/p>\n\n\n\n<p><strong>Stay updated with avitiona2z.com<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Exclusive| Adani group plans to invest Rs 10,700 crore in the expansion of Lucknow International airport <\/p>\n","protected":false},"author":3,"featured_media":28605,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[7216,7217,6761],"tags":[1827,1828,1760,2298,104,79,2030,393,115,81,134],"class_list":{"0":"post-28603","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aviation-news","8":"category-indian-aviation-news","9":"category-news","10":"tag-adani","11":"tag-adani-airports","12":"tag-adani-group","13":"tag-adani-news","14":"tag-airport","15":"tag-aviation","16":"tag-aviation-a2z-news","17":"tag-aviation-news","18":"tag-india","19":"tag-latest-aviation-news","20":"tag-lucknow"},"_links":{"self":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/28603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/comments?post=28603"}],"version-history":[{"count":2,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/28603\/revisions"}],"predecessor-version":[{"id":28607,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/28603\/revisions\/28607"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media\/28605"}],"wp:attachment":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media?parent=28603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/categories?post=28603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/tags?post=28603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}