{"id":158722,"date":"2026-09-25T03:15:00","date_gmt":"2026-09-24T21:45:00","guid":{"rendered":"https:\/\/aviationa2z.com\/?p=158722"},"modified":"2026-09-25T02:50:32","modified_gmt":"2026-09-24T21:20:32","slug":"canada-first-f-35a-takes-flight-in-major-fighter-jet-milestone","status":"publish","type":"post","link":"https:\/\/aviationa2z.com\/index.php\/2026\/09\/25\/canada-first-f-35a-takes-flight-in-major-fighter-jet-milestone\/","title":{"rendered":"Canada\u2019s 1st Most Advanced Fighter Jet in the World Operates First Flight"},"content":{"rendered":"\n<p><strong>OTTAWA-<\/strong> The <a href=\"https:\/\/aviationa2z.com\/?s=Royal+Canadian+Air+Force'\">Royal Canadian Air Force&#8217;s (RCAF)<\/a> first F-35A Lightning II has completed its maiden flight at Naval Air Station Joint Reserve Base Fort Worth (FWH), Fort Worth, Texas.<\/p>\n\n\n\n<p>The aircraft, construction number AR-1, flew for the first time on September 23, 2026, and will enter Canadian service as the CF-35A. The flight marks a major production milestone for Canada&#8217;s program to replace its CF-188 Hornet fleet.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1024x576.webp\" alt=\"Canada\u2019s 1st Most Advanced Fighter Jet in the World Operates First Flight\" class=\"wp-image-131344\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-50x28.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1600x900.webp 1600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1200x675.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review.webp 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Lockheed Martin<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-first-canadian-f-35a-takes-to-air\">First Canadian F-35A Takes to Air<\/h2>\n\n\n\n<p>Canada\u2019s first <a href=\"https:\/\/aviationa2z.com\/index.php\/tag\/f-35-lightning-ii\/\">F-35A Lightning II<\/a> completed its maiden flight from Naval Air Station Joint Reserve Base Fort Worth in Texas, where Lockheed Martin produces the aircraft. The flight began at about 12:00 PM local time on September 23, 2026, and an F-35C accompanied the Canadian aircraft as a safety chase.<\/p>\n\n\n\n<p>The flight lasted about 90 minutes. Photographer Tori Mae Fontana documented the aircraft on landing, while Gherardo and Victoria Fontana provided photographs used in the report. The Aviationist reported the flight and published the accompanying images from the maiden sortie.<\/p>\n\n\n\n<p>Construction number AR-1 identifies the aircraft as the first Canadian F-35A produced under the program. Although the aircraft is known as the F-35A during production, Canada plans to designate it the CF-35A once it enters Royal Canadian Air Force service.<\/p>\n\n\n\n<p>The aircraft had already received its full Canadian markings before its first flight. The markings follow elements associated with the RCAF&#8217;s existing CF-188 Hornet fleet.<\/p>\n\n\n\n<p>The exterior of the engine intakes carries the bilingual RCAF-ARC designation for Royal Canadian Air Force and Aviation royale canadienne. The Canadian roundel is positioned alongside the markings.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-x wp-block-embed-x\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\"><p lang=\"en\" dir=\"ltr\">Came back from military training in South Carolina with a couple of days off, and my three-year-old daughter had one thing on her mind: go take photos of airplanes with Dad.<br><br>So, we headed up to the base, cameras in hand, and ended up getting incredibly lucky.<br><br>Here it is,\u2026 <a href=\"https:\/\/t.co\/Gat7uAUi8W\">pic.twitter.com\/Gat7uAUi8W<\/a><\/p>&mdash; Eric Kilpatrick (@KpAviationPhoto) <a href=\"https:\/\/x.com\/KpAviationPhoto\/status\/2102845214058537323?ref_src=twsrc%5Etfw\">September 23, 2026<\/a><\/blockquote><script async src=\"https:\/\/platform.x.com\/widgets.js\" charset=\"utf-8\"><\/script>\n<\/div><\/figure>\n\n\n\n<p>The word Canada appears behind the cockpit, while the vertical tail carries a low-visibility Canadian flag. These details distinguish the aircraft from standard US F-35A production aircraft while maintaining a recognizable Canadian identity.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1-1024x576.jpg\" alt=\"Canada\u2019s 1st Most Advanced Fighter Jet in the World Operates First Flight\" class=\"wp-image-116614\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1-1024x576.jpg 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1-300x169.jpg 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1-768x432.jpg 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1-50x28.jpg 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1-150x84.jpg 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1-450x253.jpg 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1-1200x675.jpg 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/RDAF_F-35A-1280x720-1.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo:Airman 1st Class Dominic Tyler 56th Fighter Wing Public Affairs | Wikimedia Commons\nhttps:\/\/commons.wikimedia.org\/wiki\/File:RDAF_F-35A.jpg<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-canada-s-long-association-with-f-35-program\">Canada\u2019s Long Association With F-35 Program<\/h2>\n\n\n\n<p><a href=\"https:\/\/aviationa2z.com\/?s=Canada\" target=\"_blank\" rel=\"noreferrer noopener\">Canada&#8217;s<\/a> involvement with the Joint Strike Fighter program predates its decision to purchase the F-35A.<\/p>\n\n\n\n<p>Canada participated in the development effort as an informed partner during the late 1990s and became a Level 3 partner in 2002 during the System Development and Demonstration phase.<\/p>\n\n\n\n<p>That partnership did not immediately lead to a Canadian purchase of the fifth-generation fighter. Canada later moved to a competitive procurement process through the Future Fighter Capability Project (FFCP), which was launched in 2017 to replace the RCAF&#8217;s legacy CF-188 Hornets, the Canadian designation for the <a href=\"https:\/\/aviationa2z.com\/index.php\/tag\/boeing-f-a-18\/\">F\/A-18<\/a>.<\/p>\n\n\n\n<p>Canada selected the F-35A in 2022, and the federal government finalized the acquisition agreement on January 9, 2023.<\/p>\n\n\n\n<p>The agreement covered 88 F-35A aircraft and carried an estimated investment of C$19 billion at the time, including associated equipment, sustainment setup and services, and Fighter Squadron Facilities at Cold Lake and Bagotville. The government described it as the largest investment in the RCAF in more than 30 years.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf-1024x576.webp\" alt=\"Italian Air Force F-35 Conducts 1st Highway Operations in Finland\" class=\"wp-image-143387\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf-1200x675.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/76l5lspf.webp 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Finnish Air Force<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-procurement-review-raised-questions\">Procurement Review Raised Questions<\/h2>\n\n\n\n<p>The F-35 acquisition later came under review amid changing Canada-US relations. On March 14, 2025, Prime Minister Mark Carney announced a review of the F-35 acquisition to determine whether it remained the best choice for Canada. The review covers operational needs, NORAD and <a href=\"https:\/\/aviationa2z.com\/index.php\/tag\/nato\/\">NATO<\/a> commitments, industrial benefits, strategic partnerships and possible alternatives.<\/p>\n\n\n\n<p>Then-Defence Minister Bill Blair said in March 2025 that Canada was examining what best served the country&#8217;s defence needs. He also indicated that future purchases could potentially involve European suppliers, creating uncertainty around the full 88-aircraft plan.<\/p>\n\n\n\n<p>The review did not stop production of the initial aircraft. In October 2025, Secretary of State for Defence Procurement Stephen Fuhr said the government did not appear to be moving toward exiting the contract for the 16 aircraft already being manufactured.<\/p>\n\n\n\n<p>A later government spokesperson clarified that Canada was contractually obligated to 16 aircraft, which were in various stages of production, while a decision on the full program remained under review.<\/p>\n\n\n\n<p>Canada had already paid in full for four aircraft, while parts for another eight had been purchased, according to the October 2025 reporting. The 16-aircraft commitment therefore remained separate from the unresolved decision over the remaining 72 aircraft.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1024x576.webp\" alt=\"Lockheed Martin F-35 Lightning II\" class=\"wp-image-131344\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-50x28.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1600x900.webp 1600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review-1200x675.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/US-Canada-F-35-Review.webp 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Lockheed Martin<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-the-88-aircraft-plan-and-the-cf-188-replacement\">The 88 Aircraft Plan and the CF-188 Replacement<\/h2>\n\n\n\n<p>The original procurement calls for 88 F-35A fighters to replace the RCAF&#8217;s CF-188 fleet. The Canadian government planned to acquire the aircraft in tranches, beginning with the initial 16 aircraft.<\/p>\n\n\n\n<p>The transition has been structured to keep the CF-188 fleet available while Canada introduces the F-35A. Government planning calls for the CF-18 Hornet fleet to remain operational through its scheduled retirement in 2032.<\/p>\n\n\n\n<p>This overlap gives Canada time to train personnel, complete infrastructure and establish the support system required for F-35 operations before the older fighter fleet leaves service.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc-1024x576.webp\" alt=\"Italian Air Force F-35 Conducts 1st Highway Operations in Finland\" class=\"wp-image-143388\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc-1200x675.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/05\/854hf2cc.webp 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Finnish Air Force<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-first-f-35s-head-to-luke-air-force-base\">First F-35s Head to Luke Air Force Base<\/h2>\n\n\n\n<p>Canada&#8217;s initial F-35A aircraft will first operate from Luke Air Force Base (LUF), Arizona, rather than immediately moving to Canada.<\/p>\n\n\n\n<p>The first 8 aircraft are intended to support the training of Canadian pilots while the Department of National Defence completes the infrastructure required for F-35 operations in Canada.<\/p>\n\n\n\n<p>The current government project timeline lists the first aircraft delivery in the United States in 2026, followed by the first arrival in Canada in 2028. The first aircraft arriving on Canadian soil is planned for Canadian Forces Base Cold Lake, Alberta.<\/p>\n\n\n\n<p><a href=\"https:\/\/theaviationist.com\/2026\/09\/23\/canadas-first-f-35-conducts-maiden-flight\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">The Aviationist&#8217;s<\/a> September 2026 report stated that Canada expected the first F-35 to be delivered by the end of 2026.<\/p>\n\n\n\n<p>The aircraft&#8217;s initial location in Arizona will allow Canadian pilots to begin training before the fleet moves into Canadian operational infrastructure.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-1024x576.webp\" alt=\"\" class=\"wp-image-116613\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-50x28.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-1600x900.webp 1600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-2048x1152.webp 2048w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US_Danish_Dutch_F-35A-2529x1423-1-1200x675.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Airman 1st Class Dominic Tyler 56th Fighter Wing Public Affairs. | Wikimedia Commons\nhttps:\/\/commons.wikimedia.org\/wiki\/File:US_Danish_Dutch_F-35A.jpg<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-operational-milestones-through-2030s\">Operational Milestones Through 2030s<\/h2>\n\n\n\n<p>Canada&#8217;s published FFCP schedule places Initial Operational Capability in 2029-2030 and Full Operational Capability in 2032-2034. The current government project page also states that the F-35 fleet is expected to remain in service beyond 2060.<\/p>\n\n\n\n<p>The transition therefore extends well beyond the first aircraft delivery. Canada must complete pilot and maintainer training, infrastructure, weapons integration, information-technology systems, and sustainment arrangements before the F-35A becomes a fully operational replacement for the CF-188.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-1024x576.webp\" alt=\"\" class=\"wp-image-114652\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-50x28.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-1600x900.webp 1600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-2048x1152.webp 2048w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/09\/Norwegian_F-35_Lightning_II-2560x1440-1-1200x675.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Tech. Sgt. Timothy Boyer | Wikimedia Commons\nhttps:\/\/commons.wikimedia.org\/wiki\/File:Norwegian_F-35_Lightning_II.jpg<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-infrastructure-work-continues-in-canada\">Infrastructure Work Continues in Canada<\/h2>\n\n\n\n<p>F-35 operations require new and upgraded facilities at Canada&#8217;s main fighter bases in Cold Lake, Alberta, and Bagotville, Quebec. The infrastructure program includes facilities needed for aircraft operations, maintenance, security and support.<\/p>\n\n\n\n<p>The federal government has also been developing specialized facilities at Cold Lake. In January 2025, Canada awarded a <strong>C$15.8 million contract<\/strong> for secure enclosures forming part of a Tactical-Special Access Program Facility, with delivery planned between September 2026 and May 2027.<\/p>\n\n\n\n<p>The government identified the facility as an infrastructure component supporting the first F-35A arrival in Canada in 2028.<\/p>\n\n\n\n<p>Canada also identified L3Harris MAS in Mirabel, Quebec, as a strategic partner to investigate requirements for an F-35 air vehicle depot capable of maintenance, repair, overhaul and upgrades.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"732\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-1024x732.webp\" alt=\"\" class=\"wp-image-127797\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-1024x732.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-300x214.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-768x549.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-50x36.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-1600x1143.webp 1600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-1536x1097.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-2048x1463.webp 2048w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-150x107.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-450x321.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/01\/F-35-Fighter-jet-1200x857.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Lockheed Martin<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-program-cost-has-increased\">Program Cost Has Increased<\/h2>\n\n\n\n<p>The F-35 program&#8217;s financial estimate has also increased since the original C$19 billion figure. Current Canadian government material lists a C$27.7 billion budget for the program, including the 88 aircraft, associated equipment, sustainment setup and services, and Fighter Squadron Facilities.<\/p>\n\n\n\n<p>The Auditor General&#8217;s review identified significant cost increases, infrastructure delays, pilot shortages, and weaknesses in project risk management.<\/p>\n\n\n\n<p>The audit also found that Canada faced engineering and personnel challenges during the transition from the CF-18 to the CF-35A.<\/p>\n\n\n\n<p>These findings provide additional context for the continuing procurement review and the work required before Canada reaches full F-35 operational capability.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-1024x683.webp\" alt=\"Lockheed Martin F-35 (Edwards AFB)\" class=\"wp-image-104817\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-1024x683.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-300x200.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-768x512.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-50x33.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-1600x1067.webp 1600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-1536x1024.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-2048x1365.webp 2048w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-150x100.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-450x300.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/07\/F-35-at-Edwards-AFB-1200x800.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: USAF<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-maiden-flight-means-for-canada\">What Maiden Flight Means for Canada<\/h2>\n\n\n\n<p>The September 23 flight does not mean the CF-35A has entered operational service. It marks the movement of Canada&#8217;s first aircraft from final production into flight testing and represents a concrete step toward the planned delivery and training phases.<\/p>\n\n\n\n<p>The milestone also shows that production of the initial Canadian aircraft is proceeding despite the unresolved question surrounding the remaining 72 jets.<\/p>\n\n\n\n<p>The current commitment covers 16 aircraft, while the Canadian government continues to maintain the broader 88-aircraft acquisition framework in its published project material.<\/p>\n\n\n\n<p>The next stages include completion of flight testing, delivery to Luke Air Force Base, Canadian pilot and maintainer training, continued infrastructure work and the eventual arrival of F-35A aircraft in Canada.<\/p>\n\n\n\n<p>The long-term objective remains a phased transition from the CF-188 fleet to the CF-35A under the published 2029-2034 operational schedule.<\/p>\n\n\n\n<p>Stay tuned with us. Further, follow us on social media for the latest updates.<\/p>\n\n\n\n<p>Join us on\u00a0<a href=\"https:\/\/t.me\/s\/aviationa2z\" rel=\"nofollow\">Telegram Group\u00a0<\/a>for the Latest Aviation Updates. Subsequently, follow us on\u00a0<a href=\"https:\/\/news.google.com\/publications\/CAAqBwgKMPLdrgsw_-jGAw?hl=en-IN&amp;gl=IN&amp;ceid=IN%3Aen\">Google News<\/a><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-aviation-a-2-z wp-block-embed-aviation-a-2-z\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"rxhxwy3nUG\"><a href=\"https:\/\/aviationa2z.com\/index.php\/2026\/08\/18\/germanys-1st-f-35-enters-final-production-stage\/\">Germany&#8217;s 1st Most Advanced Fighter Jet in the World Enters Final Production Stage<\/a><\/blockquote><iframe class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"&#8220;Germany&#8217;s 1st Most Advanced Fighter Jet in the World Enters Final Production Stage&#8221; &#8212; Aviation A2Z\" src=\"https:\/\/aviationa2z.com\/index.php\/2026\/08\/18\/germanys-1st-f-35-enters-final-production-stage\/embed\/#?secret=UI8fA6fodz#?secret=rxhxwy3nUG\" data-secret=\"rxhxwy3nUG\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The Royal Canadian Air Force&#8217;s (RCAF) first F-35A Lightning II has completed its maiden flight at Naval Air Station Joint Reserve Base Fort Worth (FWH), Fort Worth, Texas.<\/p>\n","protected":false},"author":147,"featured_media":123853,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[8479,6761],"tags":[6639,7750,3633,27722,12471,737,26708,27739],"class_list":{"0":"post-158722","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-defense","8":"category-news","9":"tag-boeing-f-a-18","10":"tag-f-35-2","11":"tag-f-35-joint-strike-fighter","12":"tag-f-35-lightning-ii","13":"tag-f-35-stealth-fighter-jet","14":"tag-lockheed-martin","15":"tag-lockheed-martin-f-35-lightning-ii","16":"tag-royal-canadian-air-force"},"_links":{"self":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/158722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/users\/147"}],"replies":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/comments?post=158722"}],"version-history":[{"count":5,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/158722\/revisions"}],"predecessor-version":[{"id":158743,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/158722\/revisions\/158743"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media\/123853"}],"wp:attachment":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media?parent=158722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/categories?post=158722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/tags?post=158722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}