{"id":158183,"date":"2026-09-20T23:07:00","date_gmt":"2026-09-20T17:37:00","guid":{"rendered":"https:\/\/aviationa2z.com\/?p=158183"},"modified":"2026-09-20T22:45:54","modified_gmt":"2026-09-20T17:15:54","slug":"us-air-force-faces-14-billion-aircraft-parts-shortfall","status":"publish","type":"post","link":"https:\/\/aviationa2z.com\/index.php\/2026\/09\/20\/us-air-force-faces-14-billion-aircraft-parts-shortfall\/","title":{"rendered":"Largest Air Force in the World Faces $14 Billion Aircraft Parts Shortfall"},"content":{"rendered":"\n<p><strong>WASHINGTON, D.C.-<\/strong> The <a href=\"https:\/\/aviationa2z.com\/?s=Air+Force\">U.S. Air Force<\/a> is facing a reported $14 billion shortfall in aircraft parts as aging fleets, supply chain constraints, and maintenance backlogs put greater pressure on aircraft readiness. Air Force Materiel Command (USAF) manages much of the service\u2019s logistics and sustainment effort from Wright-Patterson Air Force Base (FFO).<\/p>\n\n\n\n<p>The scale of the problem is linked to the age of the fleet, with Air Force officials saying about 53% of aircraft are more than 30 years old and 55% have exceeded their useful service life. The service is seeking additional funding while expanding suppliers, using artificial intelligence and additive manufacturing, and accelerating parts deliveries.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080-1024x576.webp\" alt=\"Largest Air Force in the World Faces $14 Billion Aircraft Parts Shortfall\" class=\"wp-image-137407\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080-1200x675.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/03\/Germany-F-35__1920-x-1080.webp 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Lockheed Martin<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-us-air-force-supply-shortfall-reaches-14-billion\">US Air Force Supply Shortfall Reaches $14 Billion<\/h2>\n\n\n\n<p>Lt. Gen. Linda Hurry, commander of Air Force Materiel Command, disclosed the <strong>$14 billion<\/strong> supply gap during the Air &amp; Space Forces Association\u2019s 2026 Air, Space &amp; Cyber Conference.<\/p>\n\n\n\n<p>Hurry said the shortfall is affecting how the Air Force acquires aircraft parts and approaches sustainment funding. She emphasized that additional funding would need to be used efficiently because the service cannot address the entire gap at once.<\/p>\n\n\n\n<p>The supply challenge has become more significant as the Air Force continues operating aircraft well beyond the age of many commercial and newer military fleets. Older aircraft typically require more maintenance, replacement components, and engineering support, increasing pressure on the supply system.<\/p>\n\n\n\n<p>Hurry said the number of aircraft unavailable because of supply problems has increased by 87% over the past seven years. The figure highlights the connection between parts availability and the number of aircraft that can be returned to operational service.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/12\/F-22-Raptor-Fighter-Jet-1024x683.webp\" alt=\"\" class=\"wp-image-126412\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/12\/F-22-Raptor-Fighter-Jet-1024x683.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/12\/F-22-Raptor-Fighter-Jet-300x200.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/12\/F-22-Raptor-Fighter-Jet-768x512.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/12\/F-22-Raptor-Fighter-Jet-50x33.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/12\/F-22-Raptor-Fighter-Jet-150x100.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/12\/F-22-Raptor-Fighter-Jet-450x300.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/12\/F-22-Raptor-Fighter-Jet.webp 1088w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: USAF<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-aging-aircraft-increase-pressure-on-parts-supply\">Aging Aircraft Increase Pressure on Parts Supply<\/h2>\n\n\n\n<p>The Air Force operates a diverse fleet that includes aircraft designed decades ago. Some platforms have remained in service because replacing them requires major investments, long development timelines, and extensive infrastructure.<\/p>\n\n\n\n<p>According to Hurry, around 53% of the Air Force fleet is more than 30 years old. She also said 55% of the fleet has moved beyond its useful service life.<\/p>\n\n\n\n<p>The age of the <a href=\"https:\/\/aviationa2z.com\/?s=Fleet\" target=\"_blank\" rel=\"noreferrer noopener\">fleet<\/a> creates a sustainment challenge because manufacturers may no longer produce some components at the same scale as when an aircraft was new. The Air Force must therefore balance new production, existing inventories, depot maintenance and alternative sources for critical parts.<\/p>\n\n\n\n<p>The service is also looking at its supply network globally. Hurry said Air Force officials are working with partners, the Defense Logistics Agency and depots to improve the movement of parts back to operational units.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu-1024x576.webp\" alt=\"Largest Air Force in the World Faces $14 Billion Aircraft Parts Shortfall\" class=\"wp-image-139163\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu-1200x675.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/ef846wzu.webp 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: US Air Force<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-fy2027-budget-includes-sustainment-funding\">FY2027 Budget Includes Sustainment Funding<\/h2>\n\n\n\n<p>The Department of the Air Force has requested a record <strong>$338.8 billion<\/strong> for fiscal year 2027, according to the supplied budget information. The request includes $4.2 billion for the Consolidated Sustainment Activity Group, or CSAG, which manages spare parts and maintenance backlogs.<\/p>\n\n\n\n<p>The funding is intended to support the broader sustainment system, although it does not by itself eliminate the $14 billion supply gap identified by Hurry.<\/p>\n\n\n\n<p>Hurry said the Air Force is advocating for the budget request and stressed that the service needs to be prepared to execute funding as soon as it becomes available.<\/p>\n\n\n\n<p>The emphasis on execution reflects the operational impact of supply shortages. Funding for parts has limited value if the Air Force cannot efficiently identify requirements, contract suppliers, manufacture components, and deliver them to the locations where aircraft need them.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"754\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/YFQ-42_ground_test-1024x754.webp\" alt=\"\" class=\"wp-image-138882\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/YFQ-42_ground_test-1024x754.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/YFQ-42_ground_test-300x221.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/YFQ-42_ground_test-768x565.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/YFQ-42_ground_test-150x110.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/YFQ-42_ground_test-450x331.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/YFQ-42_ground_test-1200x883.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/04\/YFQ-42_ground_test.webp 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: Secretary of the Air Force Public Affairs<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-air-force-turns-to-ai-and-additive-manufacturing\">Air Force Turns to AI and Additive Manufacturing<\/h2>\n\n\n\n<p>The Air Force is also pursuing technological measures to improve its management of aircraft parts.<\/p>\n\n\n\n<p>Hurry said the service is working to improve forecasting accuracy so officials can better determine where parts will be required and position assets across the global fleet.<\/p>\n\n\n\n<p>Artificial intelligence models are being considered as part of that effort. Better forecasting can help the Air Force identify demand earlier and reduce delays caused by unexpected shortages.<\/p>\n\n\n\n<p>Additive manufacturing is another tool being used to address supply requirements. The technology can provide an alternative method for producing certain components, particularly where conventional manufacturing capacity or legacy production lines are limited.<\/p>\n\n\n\n<p>These measures are designed to complement traditional procurement rather than replace the existing supply chain.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-1024x576.webp\" alt=\"\" class=\"wp-image-122312\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-50x28.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-1600x900.webp 1600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-1536x864.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17-1200x675.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/11\/us-air-force-c-17.webp 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: USAF (For Illustrative purpose only)<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-multiple-suppliers-to-reduce-dependence\">Multiple Suppliers to Reduce Dependence<\/h2>\n\n\n\n<p>The Air Force is also seeking to increase the number of companies capable of producing critical aircraft components.<\/p>\n\n\n\n<p>Hurry said the service wants multiple industry partners producing important parts instead of depending on a single supplier. The approach is intended to create greater resilience if one manufacturer experiences production problems, capacity constraints or other disruptions.<\/p>\n\n\n\n<p>Long-term contracts are also being developed to provide greater stability across the supply chain. Such agreements can give manufacturers clearer demand signals and help the Air Force maintain access to components over longer periods.<\/p>\n\n\n\n<p>The shift toward multiple suppliers reflects the service\u2019s concern about concentrated sources of supply. A single supplier for a critical component can become a significant vulnerability if that source cannot meet demand.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/06\/B-52-JASSM-top-1024x576.webp\" alt=\"\" class=\"wp-image-145384\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/06\/B-52-JASSM-top-1024x576.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/06\/B-52-JASSM-top-300x169.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/06\/B-52-JASSM-top-768x432.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/06\/B-52-JASSM-top-150x84.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/06\/B-52-JASSM-top-450x253.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/06\/B-52-JASSM-top-1200x675.webp 1200w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2026\/06\/B-52-JASSM-top.webp 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: USAF<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-bomber-readiness-gains-from-north-star-campaign\">Bomber Readiness Gains From North Star Campaign<\/h2>\n\n\n\n<p>The Air Force has also linked improved bomber readiness to its North Star Readiness Campaign.<\/p>\n\n\n\n<p>The initiative focuses on increasing the number of mission-capable B-52 Stratofortress and B-1 Lancer aircraft by accelerating parts deliveries, engineering support, and depot maintenance.<\/p>\n\n\n\n<p>Gen. Stephen L. Davis, commander of Air Force Global Strike Command, said the campaign has become the number one driver of improved readiness in the bomber fleet because of the increase in available parts.<\/p>\n\n\n\n<p>Davis said B-52 readiness has increased by 40% under the campaign.<\/p>\n\n\n\n<p>The result illustrates how parts availability can directly affect aircraft readiness. Even when an aircraft is mechanically capable of operating, a missing component can keep it unavailable until the required part reaches the maintenance facility or operating unit.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"429\" src=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-1024x429.webp\" alt=\"\" class=\"wp-image-117789\" srcset=\"https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-1024x429.webp 1024w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-300x126.webp 300w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-768x322.webp 768w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-50x21.webp 50w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-1600x670.webp 1600w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-1536x643.webp 1536w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-2048x858.webp 2048w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-150x63.webp 150w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-450x188.webp 450w, https:\/\/aviationa2z.com\/wp-content\/uploads\/2025\/10\/US-Air-Force-13-1200x502.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Photo: USAF<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-supply-chain-has-become-a-readiness-issue\">Supply Chain Has Become a Readiness Issue<\/h2>\n\n\n\n<p>The Air Force&#8217;s $14 billion supply gap extends beyond procurement and accounting. It affects the service&#8217;s ability to keep aircraft available for missions.<\/p>\n\n\n\n<p>The 87% increase in aircraft affected by supply shortages over seven years, combined with the age of the fleet, has made sustainment a central issue for Air Force readiness.<\/p>\n\n\n\n<p>The service is responding through additional funding requests, expanded supplier networks, long-term contracts, improved forecasting, artificial intelligence, additive manufacturing, and faster movement of parts through its logistics system.<\/p>\n\n\n\n<p>The North Star campaign also provides an example of how targeted investment in parts and maintenance can affect the operational availability of combat aircraft.<\/p>\n\n\n\n<p>For the Air Force, the challenge will be matching funding with execution while managing a fleet in which a significant share of aircraft has exceeded its original useful service life. The $14 billion figure underscores the scale of the parts requirement facing the service as it works to improve readiness across its global fleet.<\/p>\n\n\n\n<p>Stay tuned with us. Further, follow us on social media for the latest updates.<\/p>\n\n\n\n<p>Join us on\u00a0<a href=\"https:\/\/t.me\/s\/aviationa2z\" rel=\"nofollow\">Telegram Group\u00a0<\/a>for the Latest Aviation Updates. Subsequently, follow us on\u00a0<a href=\"https:\/\/news.google.com\/publications\/CAAqBwgKMPLdrgsw_-jGAw?hl=en-IN&amp;gl=IN&amp;ceid=IN%3Aen\">Google News<\/a><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-aviation-a-2-z wp-block-embed-aviation-a-2-z\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"KVOpTalFhe\"><a href=\"https:\/\/aviationa2z.com\/index.php\/2026\/09\/17\/us-air-force-looks-to-new-f-16s\/\">Largest Air Force in the World Looks to New F-16s as Fighter Capacity Tightens<\/a><\/blockquote><iframe class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"&#8220;Largest Air Force in the World Looks to New F-16s as Fighter Capacity Tightens&#8221; &#8212; Aviation A2Z\" src=\"https:\/\/aviationa2z.com\/index.php\/2026\/09\/17\/us-air-force-looks-to-new-f-16s\/embed\/#?secret=oj5DVPg0mN#?secret=KVOpTalFhe\" data-secret=\"KVOpTalFhe\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>U.S. Air Force faces a $14 billion aircraft parts gap as aging fleets, supply shortages and maintenance backlogs pressure readiness.<\/p>\n","protected":false},"author":147,"featured_media":134978,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[8465,6761,7308,7307],"tags":[3203,27179,3130,12260,3131],"class_list":{"0":"post-158183","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aerospace","8":"category-news","9":"category-us-airlines-news","10":"category-usa-aviation-news","11":"tag-air-force","12":"tag-b-52-bomber","13":"tag-us-air-force","14":"tag-us-air-force-one","15":"tag-usaf"},"_links":{"self":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/158183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/users\/147"}],"replies":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/comments?post=158183"}],"version-history":[{"count":2,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/158183\/revisions"}],"predecessor-version":[{"id":158185,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/posts\/158183\/revisions\/158185"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media\/134978"}],"wp:attachment":[{"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/media?parent=158183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/categories?post=158183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aviationa2z.com\/index.php\/wp-json\/wp\/v2\/tags?post=158183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}